19 kms Crimean bridge, Russia


2014-2015 | Россия


Result of the survey – position determination of deep faults in the bridge design area.

Our survey indicated active faults in the basement (red continuous lines) and feathering faults (purple dashed lines). Red dashed lines – proposed active faults in the basement by other methods.

«West» layout
Map of deep faults
«East» layout
Kaliningrad football stadium, Russia

Похожие проекты

Streltsovskoye uranium ore field

2D model of the oil deposit in Caucasus petroleum province

Shallow gas lens search in Astrakhan

Menu